Phase I Overview

  • The LEED Silver accredited facility consists of a 6,664 sq ft office (includes lab and product testing space), 3,000 sq ft ink room, 104,268 sq ft of conditioned manufacturing/distribution area with sophisticated chilled water system, and 44,500 sq ft non-conditioned dock high warehouse.
  •  4,000 amps of underground service that supply the entire facility.
  • All equipment runs off of chilled water.
  • Two (2) 500–ton Trane air-cooled chillers for manufacturing production equipment.
  •  Specialty foundations (50’W x 96’L x 30”D in size) to bear the load of heavy equipment were installed in the manufacturing area.
  • Ink Room includes a 4-foot-high concrete wall and spill barriers at overhead door and main door around the room to contain the ink inside if there were a spill.
  • Blowout panels were installed in the exterior, and blowout relief panels were installed at the roof in case an explosion were to occur.  A special foam sprinkler system was also installed in this area.

Phase II Overview

  •  Phase II of Accredo Packaging’s campus included the addition of a 155,263 sq ft warehouse facility, with a 17,837 sq ft two-story office.
  •  Warehouse consists of a load bearing concrete tilt wall and a structural steel main frame.
  •  Live Fish Pond

Accredo Packaging, Inc.

Facility Type

Location

Size

Site

PHASE I OVERVIEW

    • The LEED Silver accredited facility consists of a 6,664 sq ft office (includes lab and product testing space), 3,000 sq ft ink room, 104,268 sq ft of conditioned manufacturing/distribution area with sophisticated chilled water system, and 44,500 sq ft non-conditioned dock high warehouse.
    •  4,000 amps of underground service that supply the entire facility.
    • All equipment runs off of chilled water.
    • Two (2) 500–ton Trane air-cooled chillers for manufacturing production equipment.
    •  Specialty foundations (50’W x 96’L x 30”D in size) to bear the load of heavy equipment were installed in the manufacturing area.
    • Ink Room includes a 4-foot-high concrete wall and spill barriers at overhead door and main door around the room to contain the ink inside if there were a spill.
    • Blowout panels were installed in the exterior, and blowout relief panels were installed at the roof in case an explosion were to occur.  A special foam sprinkler system was also installed in this area.

PHASE II OVERVIEW

  • Accredo Packaging’s campus included the addition of a 155,263 sq ft warehouse facility, with a 17,837 sq ft two-story office.
  •  Warehouse consists of a load bearing concrete tilt wall and a structural steel main frame.
  •  Live Fish Pond