Facility Type

Location

Size

Size

Bauer Manufacturing

Overview

  • Bauer, a 200-year old German company, is one of the world’s largest manufacturers of foundation equipment. The KDW team assisted Bauer in locating the ideal property in Conroe for building the company’s North American Headquarters.
  • The campus is located in the Conroe Business Park just north of Houston, sitting on 80 acres. The facility was built in phases, the first of which consisted of over 200,000 sq ft.
  • The KDW team utilized clean, low-emission materials arranged in modern, forward-thinking methods to reflect Bauer’s distinct German culture and heritage.
  • KDW designed and recreated several pieces of machinery exclusive to Bauer’s German operations.
  • The facility is not LEED Certified at the request of the client, but could pass certification at any time.
  • Bauer’s manufacturing facility has been design/built with future expansion needs in mind.
  • In 2014, a 27,200 sq ft small parts storage building was added to the campus, along with 60,000 sq ft of laydown yard.

Bauer Manufacturing

Facility Type

Location

Size

Size

OVERVIEW

  • Bauer, a 200-year old German company, is one of the world’s largest manufacturers of foundation equipment. The KDW team assisted Bauer in locating the ideal property in Conroe for building the company’s North American Headquarters.
  • The campus is located in the Conroe Business Park just north of Houston, sitting on 80 acres. The facility was built in phases, the first of which consisted of over 200,000 sq ft.
  • The KDW team utilized clean, low-emission materials arranged in modern, forward-thinking methods to reflect Bauer’s distinct German culture and heritage.
  • KDW designed and recreated several pieces of machinery exclusive to Bauer’s German operations.
  • The facility is not LEED Certified at the request of the client, but could pass certification at any time.
  • Bauer’s manufacturing facility has been design/built with future expansion needs in mind.
  • In 2014, a 27,200 sq ft small parts storage building was added to the campus, along with 60,000 sq ft of laydown yard.