Facility Type

Location

Size

Site

CHEM ONE

Overview

  • First LEED Silver chemical storage facility in Houston.
  • E2 HVAC controller provides complete control to all HVAC components on multiple systems at one time.
  • Eight (8) month construction duration.
  • Crushed rock fire lane with signage at perimeter of warehouse.
  • Complete landscape & irrigation design and installation.
  • Hidden door entry into Security and IT Room.
  • Blobel Barrier System for spill containment interlocked with fire alarm system.
  • Bulletproof package receiver to pass secure documents from one room to another.
  • Fireproof access door in tilt-wall to pass documents from office to warehouse workers.

CHEM ONE

Facility Type

Location

Size

Site

OVERVIEW

  • First LEED Silver chemical storage facility in Houston.
  • E2 HVAC controller provides complete control to all HVAC components on multiple systems at one time.
  • Eight (8) month construction duration.
  • Crushed rock fire lane with signage at perimeter of warehouse.
  • Complete landscape & irrigation design and installation.
  • Hidden door entry into Security and IT Room.
  • Blobel Barrier System for spill containment interlocked with fire alarm system.
  • Bulletproof package receiver to pass secure documents from one room to another.
  • Fireproof access door in tilt-wall to pass documents from office to warehouse workers.