  • KDW designed/built PPE’s first custom manufacturing facility in the United States to manufacture rubber.
  • The building is fully air-conditioned. The manufacturing plant is cooled by air rotation units and has several clean rooms, air loops, water loops, and bus bar for equipment.
  • High build epoxy flooring system that accepts 2,000 psi point loads.
  • The facility has overhead compressed air throughout warehouse, and overhead water and bus duct throughout plant.
  • 3,000 amp electrical service.
  • 3,000 sq ft Class X Clean Room.

Need/Problem

  • The client needed a manufacturing plant in Texas, and chose Brenham because the countryside reminded them of the United Kingdom.
  • Needed a corporate office atmosphere mirroring the facility in the UK.
  • Capability for future expansion.

KDW Solution

  • KDW designed/built entire facility in ten (10) months using our turn-key method.
  • Several specialty foundations were implemented for lean lifts and presses.
  • The 5-acre site had 15 feet of fall from East to West, and KDW balanced the site.
  • The facility is designed to accept a 15,000 sq ft future expansion.

 

Fill out my online form.

PRECISION POLYMER ENGINEERING

Location

Brenham, TX

Size

30,000 sq ft

Site

5 acres

Overview

  • KDW designed/built PPE’s first custom manufacturing facility in the United States to manufacture rubber.
  • The building is fully air-conditioned. The manufacturing plant is cooled by air rotation units and has several clean rooms, air loops, water loops, and bus bar for equipment.
  • High build epoxy flooring system that accepts 2,000 psi point loads.
  • The facility has overhead compressed air throughout warehouse, and overhead water and bus duct throughout plant.
  • 3,000 amp electrical service.
  • 3,000 sq ft Class X Clean Room.

Need/Problem

  • The client needed a manufacturing plant in Texas, and chose Brenham because the countryside reminded them of the United Kingdom.
  • Needed a corporate office atmosphere mirroring the facility in the UK.
  • Capability for future expansion.

KDW Solution

  • KDW designed/built entire facility in ten (10) months using our turn-key method.
  • Several specialty foundations were implemented for lean lifts and presses.
  • The 5-acre site had 15 feet of fall from East to West, and KDW balanced the site.
  • The facility is designed to accept a 15,000 sq ft future expansion.